BEFORE: BATHROOM DEMO. PHASE II BEGINS...

It's Christmas day for momma. Demo has begun! The dumpster arrived this morning (15 yarder) which is $170 plus $95/ton. I wanted to share what I'm anticipating my net costs to be. This should be pretty accurate as everything has been priced out + I have all of the material finalized and here:

  • Dumpster: $300

MASTER

  • Light Fixture    192
  • Tub     950.00
  • Vanity Base    1099
  • Vanity Top     1250
  • Shower Door    1000
  • Trim/Valves    1873
  • Electrical    750
  • Plumbing    1,800
  • Carpenter/Tiling    5,730
  • Extra Hardware     200
  • Paint    400
  • Marble Tile     2516
        
        
    KIDS    
  • Vanity Base  / Top    1350
  • Trim/Valves    1144
  • Ceramic     245
  • Electrical     750
  • Carpenter/Tiling     2850
  • Extra Hardware    200
  • Tub reglazing     250
  • Paint    400
  • Marble Tile     1012
  • Plumbing     1800

SUM    $28,061

Holy moly! It's crazy that these two bathrooms combined are costing more than my kitchen - but that's a story for another day. Hoping it's going to be worth it!